1) When the vacuum of the oven is not less than 13.3 pa, the vacuum of the oven should not be less than 13.3 PA during the whole process of the oven temperature rising slowly to 1300 C. After fully baking and degassing, the pressure rise rate can reach the technical requirement.

2) Limit vacuum measurement: not less than 6 x 1.0-4 Pa.

3) Measurement of working vacuum: not less than 2.7Pa (at 1000 empty hearth).

4) Pressure rise rate measurement: when the vacuum furnace is heated to 1200℃, after fully baking and degassing, the furnace temperature is cooled below 100℃, the pressure rise rate should reach 0.5Pa/h.

5) Reinflatable body debugging: When the vacuum degree of the cooling chamber is 1.33Pa, close the vacuum heat insulation and the vacuum valve of the cooling chamber, and immediately fill the cooling chamber furnace with 0.06MPa of nitrogen, the time should be 2.5 (seconds), and the vacuum degree of the heating chamber should not be less than 670Pa.

Related Products

Multi stage centrifugal blower

Multi stage centrifugal blower

Product Details

HIQ-1400VF vacuum atmosphere furnace

HIQ-1400VF vacuum atmosphere furnace

Product Details

CL Sereis liquid ring compressor in cond

CL Sereis liquid ring compressor in cond

Product Details

Low price Industrial Circulating water v

Low price Industrial Circulating water v

Product Details